J Mullen & Sons, Inc. is currently performing upgrades to the existing natural gas system for Central Hudson Gas & Electric.
As part of this project, it will require them to remove and replace the sidewalk in front of the homes on the West side of Albany Avenue.
There will be a detour for this round of excavation for sidewalk closures. Pedestrians will be directed across Albany Ave. at the crosswalks at Wiltwyck and the south side of N Manor.